Dredging is currently occurring in:
The Entrance of Port Phillip Bay (Project Area 4)
Yarra River (Project Area 1)
Vessel undertaking works:
Trailer Suction Hopper Dredge,Queen of the
Netherlands (Entrance)
Grab Dredge, Goomai (Yarra River)
Dredge material placed in:
South East Dredge Material Ground (Material from
Entrance)
Port of Melbourne Dredge Material Ground, Confined Aquatic
Disposal Facility (Material from Yarra River)
Visible outcomes of works: Turbid plumes can be
expected in the vicinity of dredging works.
Please maintain a safe distance from dredging equipment at all
times. For information on restricted access areas around vessels
please follow this link.
Further information on daily activities in each project area are
available in the tables below (n/a = no activities):
|
Dredging works: Grab dredge, the
Goomai,
is scheduled to continue dredging works south of the West Gate
Bridge in the Yarra River today (7 May). Throughout the
project, the dredge will carry out selected dredging works
around existing underwater services and docks.
Dredged material will be placed in the Port of Melbourne
Dredged Material Ground.
|
|
Dredging works: Queen
of the Netherlands
is scheduled
to continue dredging on the Nepean Bank today (7 May).
Dredged material will be placed in the South East Dredged
Material Ground. |
|
PLEASE NOTE: The information on this page is subject to change .
For further information on the location of dredging activities
please call toll free 1800 731 022.
Daily activity updates will be provided on weekdays outlining the
planned works for the next 24 hours (am to
am). The Friday daily activity update will outline
the planned works for that day and the weekend to
follow (Friday am to Monday am).
Project Areas and Dredging
Locations
_cropped_resize3.jpg)
Page last
updated: 7 May 2008