Dredging is currently occurring in:
The Entrance of Port Phillip Bay (Project Area 4)
Yarra River (Project Area 1)
Vessel undertaking works:
Trailer Suction Hopper Dredge,Queen of
the Netherlands
(Entrance)
Grab Dredge, Goomai (Yarra
River)
Dredge material placed in:
South East Dredge Material Ground (Material from Entrance)
Port of Melbourne Dredge Material
Ground, Confined Aquatic Disposal Facility (Material from Yarra River)
Visible outcomes of works: Turbid
plumes can be expected in the vicinity of dredging works.
Please maintain a safe distance from dredging equipment at all
times. For information on restricted access areas around vessels
please follow this link.
Further information on daily activities in each project area are
available in the tables below (n/a = no activities):
|
Dredging
works: Grab dredge, the Goomai, is
scheduled to continue dredging works south of the West Gate
Bridge in the Yarra River today (29/4).
Throughout the project, the dredge will carry out selected
dredging works around existing underwater services and
docks.
Dredged material will be placed
in the Port of Melbourne Dredged Material
Ground.
|
|
Dredging
works: Queen of the
Netherlands
is scheduled to continue dredging works on Nepean
Bank today (29/4).
Dredged material will be placed in the South East
Dredged Material Ground. |
|
PLEASE NOTE: The information on this page is subject to change .
For further information on the location of dredging activities
please call toll free 1800 731 022.
Daily activity updates will be provided on weekdays outlining the
planned works for the next 24 hours (am to
am). The Friday daily activity update will outline
the planned works for that day and the weekend to
follow (Friday am to Monday am).
Project Areas and Dredging
Locations
_cropped_resize3.jpg)
Page last
updated: 29
April 2008