Port of Melbourne CorporationChannel Deepening Project
  
  Contact us
  
  FAQ's
   
  Useful links

  A to Z index
 
 
 
This weeks feature page: 
Fact Sheets 

 

Home > 

A  B  C  D  E  F  G  H  I  J  K  L  M  N  O  P  Q  R  S  T  U  V  W  X  Y  Z  #  
 

A

Aboriginal cultural heritage - risk assessment
Aboriginal heritage - existing conditions
About the dredging contractor
About the dredging vessels
About the Environment Effects Statement
About the Panel Inquiry
About the PoMC
About the port overview
About the project overview
About the SEES
About this site
Access restrictions
Acronyms
Adam Cohen Response to Panel
Adam Cohen Response to Panel Attach 2(2)
Adam Cohen Response to Panel Attachment 1
Adam Cohen Response to Panel Attachment 2(1)
Adam Cohen's presentation
Adam Cohen's response to panel - attachemnt 4 (1)
Adam Cohen's Response to panel - attachment 4
Adam Cohen's response to panel - attachment 4 (2)
Adam Cohen's response to panel - attachment 4 (3)
Adam Cohen's response to panel - attachment 4 (4)
Additional PoMC documents
AES Marine Mammals and Penguins Web Summary.doc
Air emissions- initial and residual risk assessment
Air Quality Key Features
Airborne and underwater noise assessment - initial and residual risk assessment
Airborne and underwaternNoise - existing conditions
ALS results
Amdel results (1 of 2) (updated)
Amdel results (2 of 2) (updated)
Andrew Arendsen's presentation to panel
Andrew Longmore report on revised denitrification and nitrogen cycle impacts
Andy Longmore's presentation
Appendix A - Management of dredged material
Appendix B - table B1
Appendix B - table B2
Appendix M - cover sheet
April 2008 - Daily activities updates
Aquaculture, commercial an recreational fisheries- existing conditions.doc
Aquaculture, commercial and recreational fisheries - risk assessment
Archive
Archived daily activites updates
Archived dredging schedules
Archived dredging schedules
Archived media releases
Assessment of Matters of National Environmental Significance (Terrestrial Ecology and Avifauna) prepared by Brett Lane and Parsons Brinckerhoff
Attenbergs - test results
Australian Marine Ecology Marine Ecology Web Summary.doc

go to top

B

Baywide environmental monitoring
Blasting at The Heads not necessary for channel deepening
Boskalis' presentation to panel - with additional notes
Brett Lane Terrestrial Ecology Web Summary.doc
Bridget Cramphorn's & Ruth Davies' presentation to the panel
Burton presentation - revised slide 22
Byrne presenation

go to top

C

CD KFR Overview Brochure.pdf
CD KFR Summary AppendixA
CD KFR Summary AppendixB.pdf
CD KFR Summary Figure 18.2.pdf
CD KFR Summary Figure 18.3.pdf
CD KFR Summary Figure 18.4.pdf
CD KFR Summary Figure 18.5.pdf
CD KFR Summary Figure 18.6.pdf
CD KFR Summary Figure 2.10.pdf
CD KFR Summary Figure 2.2.pdf
CD KFR Summary Figure 5.2.pdf
CD KFR Summary Figure 5.3.pdf
CD KFR Summary Figure 9.1.pdf
CD KFR Summary Figure2.1.pdf
CD KFR Summary Figure2.12.pdf
CD KFR Summary Figure2.8.pdf
CD KFR Summary Figure5.1.pdf
CD KFR Summary Figures 2.9 & 2.11
CD KFR Summary Section 1.pdf
CD KFR Summary Section 12 Marine Ecology.pdf
CD KFR Summary Section 21.pdf
CD KFR Summary Section 9 Coastal engineering.pdf
CD KFR Summary Section07b.pdf
CD KFR Summary Section14.pdf
CD KFR Summary Section15.pdf
CD KFR Summary Section16.pdf
CD KFR Summary Section17.pdf
CD KFR Summary Section18.pdf
CD KFR Summary Section19.pdf
CD KFR Summary Section2 Project Definition.pdf
CD KFR Summary Section20.pdf
CD KFR Summary Section3 Legislation and Policy.pdf
CD KFR Summary Section6 - Channel stability.pdf
CD KFR Summary Section7a.doc
CD KFR Summary Table of Contents.pdf
CD KFR Summary_Section11_Air_Quality.pdf
CD KFR Summary10 Noise.pdf
CD KFR Summary13.pdf
CD_KFR_Summary_Section4_Economics.pdf
CDInceptionReport.pdf
CDInceptionReportAppendi B.pdf
CDInceptionReportAppendix E.pdf
CDInceptionReportAppendixA.pdf
CDInceptionReportAppendixC.pdf
CDInceptionReportAppendixD.pdr
CDInceptionReportAppendixF.pdf
CDInceptionReportAppendixG.pdf
CDInceptionReportAppendixH.pdf
Channel and dredge material ground stability risk assessment
Channel and dredged material ground stability - existing conditions
Channel Deepening - Assessment Guidelines.PDF
Channel Deepening EES Summary Brochure
Channel Deepening Project
Channel deepening project newsletter no. 4
Channel Deepening Project Newsletter November 03.pdf
Channel Deepening Project.PDF
Channel DTS MC Version 1.xls
Chapter 1 Introduction
Chapter 10 Key Processes
Chapter 12 Geology, geotechnical and hydrogeology
Chapter 13 Hydrodynamics, Sediment Transport and water quality modelling
Chapter 14 sediment chemistry and water quality
Chapter 15 Coastal Engineering
Chapter 16 Noise
Chapter 17 air quality and greenhouse
Chapter 18 Marine Ecology
Chapter 19 Aquaculture, commerical and recreational fisheries
Chapter 2 Need for Project
Chapter 20 Marine mammals and penguins
Chapter 21 Terrestrial ecology and birds
Chapter 22 Aboribinal Heritage
Chapter 23 Non-aboriginal heritage
Chapter 24 Visual
Chapter 25 Tourism and recreation
Chapter 26 Synthesis of Key Features
Chapter 27 Base-case Dredging Scenario
Chapter 28 Hydrodynamics, sediment transport and water quality modelling
Chapter 29 Geology, geotechnical and hydrogeology
Chapter 3 Key Evaluation Objectives
Chapter 30 Channel & Dredged Material Ground stabilit
Chapter 31 Sediment Chemistry and water quality
Chapter 32 Coastal Engineering
Chapter 33 Noise
Chapter 34 Air Quality and greenhouse
Chapter 35 Marine Ecology
Chapter 36 Aquaculture, Commercial & Recreational Fisheries
Chapter 37 Marine Mammals and Penguins
Chapter 38 Terrestrial Ecology and Birds
Chapter 40 Non-Aboriginal Heritage
Chapter 41 Visual
Chapter 42 Tourism and Recreation
Chapter 43 Economics
Chapter 44 Synthesis of initial risk management
Chapter 45 Enironmental Management Plan
Chapter 46 Residual Risk Assessment
Chapter 47 Commonwealth assessment
Chapter 48 State Assessment
Chapter 49 Community Impact Assessment
Chapter 5 Project Definition
Chapter 50 Regional Analysis
Chapter 6 Legislation and Policy
Chapter 7 Assessment Approach
Chapter 8 Consultation
Clarification of project definition
Coastal engineering
CoastalEng
Community & Bay User information overview
Community Consultation Report
Community Impact Assessment report
Community information evenings for trial dredge
Community information sessions for the SEES
Community Information Sesssions - 2008
Community liaison group
Consolidation test
Consultation & exhibition overview
Contact us
Copyright
Covering Letter to accompany timetable - 10.09.04

go to top

D

Daily activities update
David Cotterill's presentation to panel
David Provis expert witness statement - Annexure D
David Provis expert witness statement - high resolution figures from Annexure D
David Provis' presentation to panel
David Rhodes' presentation to panel
Deep Reef Impact Assessment
Dennis Williamson's presentation to panel
Disclaimer
Dive Industry Liaison Group
Documents from the panel
Documents preceding EES
Don Raisbeck presentation
Dr Graham Harris BSc, ARCS, DIC, PhD, FTSE
Dredging schedule

go to top

E

Economic Impact Report
Economic impacts study
Economic.pdf
EES and its technical appendices
EES consolidated bibliography of Technical Appendices
EES consolidated Table of Contents
EES Errata and Update Report
EES guidelines
EES Study Team
Effective stress triaxial test
Employment Opportunities overview
Environment Effects Statement overview
Environment overview
Environmental management
EW - Expert pro-forma letter - 15.06.04
Expert Witness CV - Peter Burton - Maritime
Expert witness CV - Raisbeck - geotechnology
Expert Witness Statement - environmental impact assessment
Expert witness statement - Marine Mammals, Penguins
Expert witness statement - acoustics, noise levels
Expert witness statement - archaeology, heritage
Expert witness statement - channel design
Expert witness statement - channel design
Expert witness statement - channel design
Expert witness statement - channel design
Expert witness statement - coastal engineering
Expert Witness Statement - community and social impact, community consultation
Expert Witness Statement - ecology, ecotoxicology
Expert Witness Statement - economic impacts
Expert witness statement - economics, tourism
Expert witness statement - fish, fisheries
Expert witness statement - geotchnology
Expert witness statement - geotechnical engineering
Expert witness statement - impact on adjacent structures
Expert Witness Statement - indigenous and non-indigenous archaeology, cultural heritage
Expert Witness Statement - indigenous heritage
Expert Witness Statement - indigenous heritage
Expert witness statement - marine and estuarine systems
Expert Witness Statement - marine ecology
Expert witness statement - maritime engineering
Expert witness statement - ornithology, terrestrial ecology
Expert witness statement - physical oceanography
Expert Witness Statement - transport economics, maritime economics
Expert witness statements - channel design
Expert witness statements - channel design
Expert witness statements - Newcombe CV

go to top

F

Fact sheets
February 2008 - Daily activities updates
February 2008 - Daily activities updates
Figure 1 Port Phillip Bay from space

go to top

G

General Directions - 10.09.04
Geological key features Appendix C figure-c10 geological section H Bolte Bridge
Geological key features Appendix C figure-c7 geological section E Coode Island
Geological key features Appendix C figure-c9 geological section G Appleton Dock
Geology key features - Sediment Chemistry
Geology key features - geological and hydrogeological studies
Geology key features - geological, geotechnical and hydrogeological investigations
Geology key features - various figures
Geology key features Appendix B - borehole logs
Geology key features Appendix C - cross section locality plan
Geology Key Features Appendix C - figure-c2 geological section A Yarra River-Webb Dock
Geology key features Appendix C figure c-2 geological section B1 Webb Dock
Geology key features Appendix C figure c-4 geological section B2 Webb Dock
Geology key features Appendix C figure-c5 geological section C Hobson Bay Sewer
Geology key features Appendix C figure-c8 geological section F Swanson Dock
Geology key features Appendix C figure-d6 geological section D West Gate Bridge
Geology key features Appendix F - Port Phillip Bay hydraulics
Geology key features Appendix G - inflow into Yarra River
Geology key features Appendix H - groundwater intrusion calculations
Geology key features Appendix I - sediment chemistry tables
Geology key features Appendix J - sediment chemistry analytical procedures
Geology key features Appendix K - field duplicate results
GHD Channel and Dredge Material Ground Web Summary.doc
Glossary
Governance and EMP Directions
Government approvals for trial dredge
Greg Jenkins' presentation to panel

go to top

H

Hearing Diagram RS v2 - 10.09.04
How is dredging done?
HRL results
Hydrodynamics, sediment transport and water quality modelling
Hydrodynamics, sediment transport and water quality modelling - model calibration

go to top

I

Inception Report & Specialist Studies
Independent Peer Review - Kerry Black
Index to PoMC expert witnesses
Information Packs
Issues by Subject - 10.09.04

go to top

J

John Arup presentation
John Arup's second presentation to panel

go to top

K

Key Features Report
Key management strategies
Key Management Strategies Overview Brochure

go to top

L

Latest media releases
Latest news overview
Lawson and Treloar Hydrodynamics Web Summary.doc
Letter from Brett Lane re turbidity modelling
Letter from David Cotterill re revised tourism and recreation financial impacts
Letter from Simon Mustoe re turbidity modelling
Letter to the panel from Simon Mustoe
Little penquin and marine mammals sensitivity analysis

go to top

M

MAFRI Fisheries Web Summary.doc
MAFRI Sediment Chemistry Web Summary.doc
March 2008 - Daily activities updates
Marine ecology - Chapter 14 Physical Pressure and Effects
Marine ecology specialist studies - microphytobenthos
Marine Ecology Specialist Studies - Vol 1: Introduction and approach
Marine Ecology Specialist Studies - Volume 8: Plankton and nekton
Marine Ecology Specialist Studies Vol 12: Inventory of ecological communities and management units
Marine ecology specialist studies Vol 16: Seagrass
Marine Ecology Specialist Studies Volume 10: Multimedia maps
Marine Ecology Specialist Studies Volume 11: Impact analysis methods
Marine Ecology Specialist Studies Volume 13: Description of impact processes
Marine ecology specialist studies Volume 15: Introduced species
Marine ecology specialist studies Volume 17: Oil spills
Marine ecology specialist studies Volume 18: Pyura
Marine Ecology Specialist Studies Volume 19: Sediment biota impact and risk assessment
Marine Ecology Specialist Studies Volume 2: Legislative and policy requirements
Marine Ecology Specialist Studies Volume 20: Shallow reef impact and risk assessment
Marine ecology specialist studies Volume 21: Deep Reef
Marine ecology specialist studies Volume 22: Environmental management
Marine Ecology Specialist Studies Volume 3: Infauna
Marine Ecology Specialist Studies Volume 5: Seagrass and sediment biota
Marine Ecology Specialist Studies Volume 6: Shallow reef biota
Marine Ecology Specialist Studies Volume 7: Deep reef biota
Marine Ecology Specialist Studies Volume 9: Ecological processes
Marine mammals & little penguins existing conditions
Marine Mammals & Little Penguins Risk Assessment
Maritime and coastal non-aboriginal heritage impact assessment
Maritime and coastal non-aboriginal heritage key features
Matt Edmunds' Presentation
Matthew Stead's Presentation to panel
May 2008 - Daily activities updates
Melbourne at risk without deepening
Microsoft PowerPoint - Bayside City Council presentation
Microsoft PowerPoint - DIVA Predictive Risk - Channel Project - Expert Panel Presentation
Microsoft PowerPoint - EPA Panel Presentation
Microsoft PowerPoint - Frank Hart - supplementary presentation materials
Microsoft PowerPoint - Phillippa Rayment powerpoint presentation
Microsoft PowerPoint - Rob Mort Presentation
Microsoft PowerPoint - Sails Sorrento presentation - Eco Islands
Microsoft PowerPoint - SimonRobertspresentation
Microsoft PowerPoint - Surf Coast Surfrider Foundation - 22.11.04
Microsoft Word - 04.10.07, doc re production and~ 004554149v5.doc
Microsoft Word - 040908sm.doc
Microsoft Word - 2108034C-020SG FINAL APPENDIX C.doc
Microsoft Word - 2128034C-020SG FINAL Chapter 39 Aboriginal Heritage _04 July 04_.doc
Microsoft Word - 2128034C-020SG FINAL Chapter 4 Alternatives updated _3 Jul 04_.doc
Microsoft Word - 2128034C-020SG FINAL Chapter 9 Dredging Activities... 01 Jul 04.doc
Microsoft Word - 2128034C-020SG FINAL SUMMARY_ July 4 redone 8 p.m..doc
Microsoft Word - Channel_Deepening_EES_submission_041206.doc
Microsoft Word - Earthcare EES presentation final.doc
Microsoft Word - Earthcare - plan to the hearing panel _1_.doc
Microsoft Word - Ecogen Energy - Submission No 2 - 3 12 04.doc
Microsoft Word - EES Panel Presentation_final.doc
Microsoft Word - EPA Response to Panel Issues Paper Part 2.doc
Microsoft Word - EPA Response to Panel Issues Paper.doc
Microsoft Word - F. Hart Expert Witness statement.doc
Microsoft Word - Fish in Yarra.
Microsoft Word - Shipping Australia - response to Panel query.doc
Microsoft Word - Simon Roberts - PPB dredging doc1.doc
Microsoft Word - VCA EES Geotech Conditions r~03.doc
Microsoft Word - VNPA Bay Panel Presentation.doc
MSG aquifer investigation - Appendix C contamination laboratory results
MSG aquifer investigation - contour figure
MSG aquifer investigation - Piezo figures
MSG aquifer investigation - surface topography figure
MSG aquifer investigation - water quality laboratory results
MSG aquifer investigations - Appendix A MSG aquifer borelogs
Murdoch University results - algal cysts

go to top

N

NAME:
Newsletter
Noise
NonAboriginal
Notifications

go to top

O

Options for viewing or obtaining a copy of the SEES
Other archived documents
Other archived documents
Other archived documents (post commencement of dredging)
Overview of the port

go to top

P

Panel Issues Paper - 10.09.04
Panel Issues Paper 2
Panel Issues Paper 2A
Panel Issues Paper 3
Panel Issues Paper 4
Panel Issues Paper 5
Particle size distribution - 1 of 2 reports
Particle size distribution - 2 of 2 reports
Penguin surveys, Nov - Dec 2004
Peter Burton's presentation to panel inquiry
Petrographic report
PoMC expert witness statements
PoMC further explanation of project definition
PoMC Governance Paper
PoMC Governance Paper Annexure GP1
PoMC Governance Paper Annexure GP2
PoMC Panel Hearing Presentation
PoMC Part C submission - Annexure C1 - seagrass
PoMC Part C Submission - Annexure C2 - anchovy
PoMC response to Issues Paper 2
PoMC response to issues paper 2 - Ann IP10.2
PoMC Response to issues paper 2 - Ann IP11.3
PoMC Response to Issues Paper 2 - Ann IP11.4
PoMC response to issues paper 2 - annexure 11.4(4)
PoMC response to issues paper 2 - annexure IP11.4(2)
PoMC Response to Issues Paper 2 - annexure IP11.4(3)
PoMC response to Issues Paper 2 - annexure IP2.4
PoMC Response to Issues Paper 2 - annexure IP3
PoMC Response to Issues Paper 2 - Annexure IP6.3B
PoMC Response to Issues Paper 2 annexure ip5.10
PoMC response to Panel Issues Paper 2A
POMC Submission Part A
PoMC Submission Part B
PoMC Submission Part B - Annexure B1
PoMC Submission Part B - Annexure B2
PoMC Submission Part B - Annexure B3
PoMc Submission Part C
PoMC Submission Part D
PoMC submission Part E
PoMC submission part E - Annexure E1
PoMC submission part E - Annexure E2
PoMC submission part E - Annexure E3
PoMC submission part E - Annexure E4
PoMC submission part E - Annexure E4 part 10 figure
PoMC submission part E - Annexure E5
PoMC submission part E - Annexure E6 (title page)
PoMC submission part E - Annexure E6(2)
PoMC submission part E - Annexure E6(3)
PoMC Submission Part F
PoMC submission Part F - Annexure F1
PoMC submission Part F - Annexure F2, Specialist Recommendations
PoMC submission to panel Part G
PoMC witness list and proposed panel hearing timetable
Port of Melbourne Corporation hits out at false statements on channel deepening (22 July 2003)
Ports Agenda 2004
Presentation by Rob Day and Chris Boyd
Privacy
Project approval
Project benefits
Project definition presentation by Brad Richards
Project overview
Project Stakeholder Advisory Committee
Project updates
Project works - Dredging
Project works - Other
Public release of Channel Deepening EES
Public submission process
Publications overview

go to top

Q

No Documents

go to top

R

R01a2128034B_Key Features Summary_Chap 5.doc
R01a2128034B_Key Features Summary_Chap 8.doc
REPORT BY DR GRAHAM HARRIS
Risk Monitoring Summary 270604 PRG.xls
Risk Report (Economic Specialist Study)

go to top

S

Sarah Myers Letter of Clarification to Panel
Sarah Myers' presentation to panel
Scenic Spectrums Visual Web Summary.doc
Schedule & locations overview
Seabird_Surveys_Port_Philip_Bay_FINAL_REPORT_v2.doc
Seasonal sensitivites
Sediment chemistry and water quality
Sediment Chemistry and Water Quality - Existing Conditions
SEES Main Report and Executive Summary
SEES Main Report and Executive Summary
SEES Technical Appendices
SEES Technical Appendices
Simon Mustoe's presentation to panel
SKM Geology Hydrogeology and Geotechnical Web Summary.doc
SKM Tourism and Recreation Web Summary.doc
Slide 1
Special Directions B - Late Submissions
Stage 2 additional environmental survey work - Appendix A figure 32846
Stage 2 additional environmental survey work - Appendix A figure 32851
Stage 2 additional environmental survey work - Appendix A figure 32854
Stage 2 additional environmental survey work - Appendix B table 4.4
Stage 2 additional environmental survey work - Appendix B Table 4.5
Stage 2 additional environmental survey work - Appendix B table 4.7
Stage 2 additional environmental survey work - Appendix C
Stage 2 additional environmental survey work report
Stage 2 additional evironmental survey work - Appendix B table 4.6
Stage2 additional environmental survey work - Appendix B table 4.8
Stage2 additional environmental survey work - Appendix B table 4.9
Steve Meyrick's presentation
SubmissionToTourismVictoria
Summary of scope of works/methodology and the consultancy undertaking the Air Quality & Greenhouse study for Channel Deepening Project
Summary of scope of works/methodology the Community Impact Assessment study
Summary of scope of works/methodology the Dredged Material Management Options study
Supplementary EES

go to top

T

Table of Contents
Temporary Access Closures - Francis St bank
Terra Culture Aboriginal Heritage Web Summary.doc
Terrestrial ecology (including birds) existing conditions
Terrestrial ecology, including birds
The proponent has, in various documents, set out the legislation under which approval is required, and identified the decision maker
Third party documents
Timetable change - Directions Hearing for governance and enrionmental management processes
Timetable for Channel Deepening EES panel hearings Version 8
Timetable for EMP Governance Workshops
Tourism and recreation - initial and residual risk assessment
Tourism and recreation key features
Trade
Trial dredge environmental management plan
Trial dredge environmental monitoring
Trial dredging approvals
Trial dredging bulletin
Trial dredging overview
Trial dredging schedule
Triaxial test

go to top

U

Useful links

go to top

V

VECCI welcomes trial dredging and EES guidelines
Visual impacts assessment, scenic perception survey results
Visual impacts risk assessment
Visual Key Features report
Visual Key Features report
Vol 2 Geology, geotechnical and hydrogeology risk assessment

go to top

W

Water ecoscience results
Water studies centre results
Weekly turbidity monitoring results

go to top

X

XRD reports - detailed clay mineralogy of samples

go to top

Y

No Documents

go to top

Z

No Documents

go to top

#

Chapter 11 Economics
Expert Witness Statement - Air Quality
MSG Aquifer investigation report
2128034C-020SG FINAL CONTENTS.indd
28980-3 Model (1)

go to top